[Skip to Content]

Search

Search by these terms

Procure Products

in the Green Procurement Compilation

97 Results : meter

  • Computer/LAN room - Details View - GSA Sustainable Facilities Tool

    ...for buildings install at least two meters, one that measures cooling load and
    https://sftool.gov › explore › green-workspace › 86 › computerlan-room
  • PowerPoint Presentation

    Transformers, voltage drop, electrical metering Lighting Reduced lighting power...of equipment, chilled water plant metering, economizer fault detection and diagnostics
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › 3 - ASHRAE 90.1-2013 and 10 CFR 433 - Halverson ISWG 191205.pdf
  • PowerPoint Presentation

    ...year 2018 with a focus on Energy Metering and Power Usage Effectiveness (PUE)...required to install automated energy metering tools to measure PUE metric for reporting
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › 1 - Pomeroy DCOI Deck_ISWG.pdf
  • Green Globes Basic Presentation

    Measurement and Verification: Electricity meters - Per the Energy Policy Act of 2005...install building level electricity meters in new major construction and renovation
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › 14 Erin Shaffer - Principles for New and Renovation Construction.pdf
  • Stories - GSA Sustainable Facilities Tool

    ...high-performance by integrating advanced metering and retrocommissioning building systems
    https://sftool.gov › apply › stories
  • ISWG

    C o u n t Wynkoop 7th Floor Water Metering Pre-retrofit Event occurrences by...C o u n t Wynkoop 7th Floor Water Metering Post Retrofit Event occurrences by
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › 13 Judith Heerwagen - EPA Denver Demonstration Project.pdf
  • Financial > Water - GSA Sustainable Facilities Tool

    ...labor, fertilizer, and pruning costs. Metering provides the opportunity to have greater
    https://sftool.gov › explore › green-building › section › 42 › water › financial-impact
  • New FEMP Guiding Principles Tool

    ...water used for irrigation need to be metered? Yes. Non-potable and potable water...water used for irrigation needs to be metered for irrigation systems serving more
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › ISWG Baker GPs FAQ 07-20-2017.pdf
  • LEED v4 BDC (Statutory Compliance with Guiding Principles)_02-2021.pdf

    ...103 Metering [42 U.S.C. § 8253(e)] NC&M Criteria 2.2 - Energy Metering Ensured...prerequisite EAp3: Building-Level Energy Metering. EISA 2007 Sec 523 - Solar Hot Water
    https://sftool.gov › Content › attachments › LEED v4 BDC (Statutory Compliance with Guiding Principles)_02-2021.pdf
  • PowerPoint Presentation

    ...how to apply best practices. T8-S3: Metering This session will illustrate how to...to extract useful data from smart meters and utility invoices to identify actionable
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › 1 - EEx and BB Summit 2018 - ISWG Updates Sept 2018.pdf
  • PowerPoint Presentation

    Methods of Data Entry Regularly Meters for materials that are picked up on...the percent full Intermittently Meters for infrequent or 1-time events (e
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › Overview - Materials Management and Waste Tracking in Portfolio Manager.pdf
  • Partnering with the U.S. Department of Energy for Efficiency

    ...constant volume pumps to VFDs ● Built-in metering and reporting via BAS or mobile device...pump energy savings ● Assess onboard metering value Value to Owners and Operators
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › Commercial Buildings Integration Group Update.pdf
  • Grid-Interactive Efficient Buildings - GSA Sustainable Facilities Tool

    Concerns: Need smart controls, advanced metering, cybersecurity protections Revise
    https://sftool.gov › learn › about › 638 › grid-interactive-efficient-buildings
  • Child Care Centers - GSA Sustainable Facilities Tool

    ...products for equipment replacement. Sub-meter and monitor water use to detect and
    https://sftool.gov › learn › about › 502 › child-care-centers
  • Building Operations and Maintenance Services - GSA Sustainable Facilities Tool

    ...(EMIS) to monitor, analyze, and control metered building energy use and system performance
    https://sftool.gov › plan › 268 › building-operations-maintenance-services
  • Green Globes New Construction (Statutory Compliance with Guiding Principles) 2013_02-2021.pdf

    ...103 Metering [42 U.S.C. § 8253(e)] NC&M Criteria 2.2 - Energy Metering Ensured
    https://sftool.gov › Content › attachments › Green Globes New Construction (Statutory Compliance with Guiding Principles) 2013_02-2021.pdf
  • What is Sustainability? - GSA Sustainable Facilities Tool

    ...2007 (EISA) requires that all federal metered buildings subject to energy reduction
    https://sftool.gov › learn › about › 41 › sustainability
  • FBI Energy and Water Steering Committee Meeting FY21 Q2

    ...building automation system upgrades, metering, energy audits, and commissioning
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › FEWCIP Huxley and Koprowski ISWG 4.15.21.pdf
  • GSA Impact Study_ISWGpost.pdf

    ...and utility expenses based on the metering configuration of the building or project
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › GSA Impact Study_ISWGpost.pdf
  • PowerPoint Presentation

    ...material, hardly any on advanced metering.” “More on net zero water, energy
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › 5 - Energy Exchange 2017 - ISWG 1-12-17.pdf

   Page
      1       2       3      4       5
Powered by Search.gov