[Skip to Content]

Search

Regionally Sourced/Harvested/Extracted

Most materials, goods and products travel a far distance via ship, train or truck before arriving at their final destination.  The impacts associated with transporting those goods and products can be significant – added traffic congestion, increased greenhouse gas emissions, and worsening of air pollution.  By selecting products that are locally sourced, the impacts of transportation are minimized. Additionally, choosing local or regional materials supports the local economy.

Procure Products

in the Green Procurement Compilation

144 Results : regionally

  • ISWG

    Interagency Working Group July 18, 2013 EPA Region 8 Headquarters, Denver The most intensively
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › 13 Judith Heerwagen - EPA Denver Demonstration Project.pdf
  • Framework Step 2: Assess - GSA Sustainable Facilities Tool

    ...weather event projected to change in the regions in which the supply chain operates
    https://sftool.gov › plan › 558 › framework-step-2-assess
  • Guiding Principles for High Performance and Sustainable Federal Buildings and Associated Instructions

    ...align, where possible, with local and regional planning goals; protect natural, historic...Report NESDIS 142-9, January 2013 Regional Climate Trends and Scenarios for the
    https://sftool.gov › Content › attachments › guiding_principles_for_sustainable_federal_buildings_and_associated_instructions_february_2016.pdf
  • Slide 1

    Participation from almost all GSA regions GSA National Deep Energy Retrofit
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › 11 CaraCarmichael Victor Olgyay - RMI Deep Energy Retrofits.pdf
  • GSA Sustainable Buildings Program.pdf

    ...quarter FY15 ❏ Recurring national and regional trainings have successfully developed
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › GSA Sustainable Buildings Program.pdf
  • Project Manager - GSA Sustainable Facilities Tool

    ...though he was based in a different region, he was able to establish a strong
    https://sftool.gov › plan › 585 › project-manager
  • Government Facility Sustainability Performance in FY 2016

    ...centrally-managed systems or entered by regional/facility managers bottom-up Reports
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › ISWG Tremper 07-20-2017.pdf
  • 2011 Project Review Powerpoint Presentation

    ...central source of information for GSA regional managers Conclusions 9  Deep retrofits
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › Deep Energy Savings Using ESPCs.pdf
  • Challenges in Implementing an Agency-wide Advanced Metering System: IT Security and Support Needs

    Local Support GSA IT Security GSA Regions Metering O&M Inception to Activation
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › 1 - GSA_Challenges in Implementing an Agency-wide Advanced Metering System- IT Security and Support Needs_v2 1.12.17.pdf
  • Responsible Business Conduct - GSA Sustainable Facilities Tool

    ...in the Xinjiang Uyghur Autonomous Region of the People's Republic of China,
    https://sftool.gov › plan › 545 › responsible-business-conduct
  • Emerging Technologies

    Compressor No. of deployments per GSA region Deployment of Maglev Chillers across
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › GPG - K Powell GSA - ISWG 180517.pdf
  • Health and Wellness Crosswalk - GSA Sustainable Facilities Tool

    Salvaged Material Content 9.4.1.2 Regional Materials 9.4.1.3 Biobased Products...Salvaged Material Content 9.4.1.2 Regional Materials 9.4.1.3 Biobased Products
    https://sftool.gov › learn › crosswalk
  • Microsoft PowerPoint - Annex 73 presentation webinar.pptx

    ... The frequency and duration of regional power outages from weather, manmade
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › Zhivov - Energy planning resilience ISWG 181206 Final.pdf
  • GSA Framework for Managing Climate Change Risks to Federal Agency Supply Chains

    ...provides information on United States regional and state-level changes in the frequency...climate change projections (with regional impacts), see the Intergovernmental
    https://sftool.gov › Content › attachments › GSA Supply Chain Climate Risk Mgmt Framework_Final_508c.pdf
  • Slide 1

    ... 5 distinct buildings in the same region All buildings have had energy projects
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › 3 - 092216_ISWG Campus Management_FINAL.pdf
  • Slide 1

    ... 5 distinct buildings in the same region All buildings have had energy projects
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › 3 - 092216_ISWG Campus Management_FINAL.pdf
  • Child Care Centers - GSA Sustainable Facilities Tool

    ...the center. Typically, this is the regional child care coordinator (RCCC) at GSA
    https://sftool.gov › learn › about › 502 › child-care-centers
  • Interim Report on Evaluation of GSA Total Estimated Cost Impact (TECI) Metrics Center for Building Performance and Diagnostics Carnegie Mellon University May 31, 2019

    GSALink provides Building Managers, Regional Managers and the Central Office a
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › GSA CMU TECI ISWG October 2020.pdf
  • A Temperature and Seasonal Energy Analysis of Green, White and Dark Roofs

    ...we have around the NYC metropolitan region. A graph of the hourly average temperatures...increasing reflectivity in other spectral regions, such as near-infrared, may be equally
    https://sftool.gov › Content › attachments › Columbia_A_Temperature_ and_Seasonal_Energy_Analysis.pdf
  • Slide 1

    ...national OoL stakeholders, including Regional POCs, LCOs and LAMs EPA PM Pilot 2
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › ISWG green leasing update 7-20-16.pdf

   Page
      1       2       3       4       5       6      7       8
Powered by Search.gov