[Skip to Content]
SFTool has a new login! Please register with Login.gov. To retain your existing SFTool account information (FEDSAT, Total Workplace Scorecards, & GPC Lists), use our MERGE PAGE after logging in to migrate your data.

Search

Controllability

Workspaces should be designed to allow for occupant control over lighting (light switches, occupant or daylight sensors with override capability, etc) and thermal comfort (operable windows, individual thermostats, and underfloor air diffusers). Building operators should provide information about control use to occupants.

Procure Products

in the Green Procurement Compilation

236 Results : Controllability

  • MaterialDetails - GSA Sustainable Facilities Tool

    ...requirements. Look for dual-flow shower controls that allow the user to reduce and
    https://sftool.gov › material › 2032 › low-flow-shower
  • Interior Lighting Campaign M. Myer, March 2017

    Equipment Controls (on existing equipment) New Equipment + Controls En er gy...new equipment  100,000 kWh from controls  78% energy reduction compared to
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › Interior Lighting Campaign %E2%80%93 M. Myer March 2017.pdf
  • Partnering with the U.S. Department of Energy for Efficiency

    Optimization Control Plug Loads ● Data-driven Receptacle Control Water ● Chemical-Free...for Daylight Harvesting & Thermal Control Energy Management Platform ● Convert
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › Commercial Buildings Integration Group Update.pdf
  • SECTION B

    ...exterior areas of a building. The Pest Control requirement is specified in 7 U.S...Recommendations for Pest Management and Control Application of chemical and non-chemical
    https://sftool.gov › Content › attachments › GSA_IPM_Guidance.pdf
  • Here's the problem…

    ...are increasingly relying on building control systems with embedded communications...sector.” 3 CASE STUDY: IBM Building Control System Vulnerabilities IBM Ethical
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › 2 - Overview of the BTO Cybersecurity Related Buildings Project.pdf
  • GPG Overview - KPowell Sep2013, updated May2015.pdf

    Strategy Variable-Speed Chiller Plant Control LIGHTING Integrated Daylighting Systems...Wireless Lighting Controls LED Lighting with Integrated Controls LED Replacement
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › GPG Overview - KPowell Sep2013, updated May2015.pdf
  • Interior Lighting Campaign M. Myer, March 2017

    Equipment Controls (on existing equipment) New Equipment + Controls En er gy...new equipment  100,000 kWh from controls  78% energy reduction compared to
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › Interior Lighting Campaign %E2%80%93 M. Myer March 2017.pdf
  • Interior Lighting Campaign M. Myer, March 2017

    Equipment Controls (on existing equipment) New Equipment + Controls En er gy...new equipment  100,000 kWh from controls  78% energy reduction compared to
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › Interior Lighting Campaign %E2%80%93 M. Myer March 2017.pdf
  • Slide 1

    Today Future 1. Building systems controls and integration Building management...loads (HVAC) Individual system controls (lighting, storage) Single, overarching
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › 4 - Sandler-Hydras GEB talk for ISWG 12-5-19 v5.pdf
  • Emerging Technologies

    Chillers LED Fixtures with Integrated Controls High-R Window Panel Retrofits Occupant...Boiler Solar Control Films Weather Station for Irrigation Control Non-Chemical
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › GPG - K Powell GSA - ISWG 180517.pdf
  • PowerPoint Presentation

    ...implementation of smart building controls. Copyright © 2019 DOE's Better Buildings...safety Inefficient and costly Poor control of environmental conditions Failure
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › 4 - NREL - 3Flow - Smart Labs - LVMP Preso for ISWG 3-7-19 v1.pdf
  • ESPC ENABLE PROGRAM

    ...lighting, water fixtures, basic HVAC controls, HVAC equipment replacement and solar...Lighting Lamps, Ballasts, Fixtures Controls: Occupancy, Day lighting (on/off,
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › ISWG.ESPC ENABLE Jan 21 2016_final.pdf
  • Building Heating, Ventilation, and Air Conditioning (HVAC) - GSA Sustainable Facilities Tool

    ...changing or replacing air in any space to control temperature; remove moisture, odors
    https://sftool.gov › learn › about › 571 › building-heating-ventilation-air-conditioning-hvac
  • Climate Terms and Tools - GSA Sustainable Facilities Tool

    ...occur from sources that are owned or controlled by an organization (e.g., emissions...activities from assets not owned or controlled by the reporting organization, and
    https://sftool.gov › learn › about › 639 › climate-terms-tools
  • U.S. Waste and Recycling - GSA Sustainable Facilities Tool

    ...compost can also be used for erosion control. EPA | Composting at Home Guiding
    https://sftool.gov › learn › about › 184 › us-waste-recycling
  • Green Procurement - Federal Requirements - Bathroom Sink Faucets & Accessories (Residential) - GSA Sustainable Facilities Tool

    ...from a pipe or container can be controlled. Product Details To the maximum extent
    https://sftool.gov › greenprocurement › green-products › 23 › plumbing-systems › 11 › bathroom-sink-faucets-accessories-residential › 0
  • Policies & Strategies - GSA Sustainable Facilities Tool

    ...cyberattacks; DOD's use of the Industrial Control Systems Cyber Emergency Response Team...Physics Lab, showing scenarios in which control systems could be used to exploit vulnerabilities
    https://sftool.gov › learn › agency-practices › 444 › iswg-policies-strategies
  • Green Procurement - Federal Requirements - Smart Thermostats - GSA Sustainable Facilities Tool

    Last Updated: 02/27/24 A device that controls heating, ventilation, and air-conditioning
    https://sftool.gov › greenprocurement › green-products › 24 › hvacmechanical › 1754 › smart-thermostats › 0
  • U.S. Department of Energy GreenBuy Award Program - Fiscal Year 2024

    Suppressant Fertilizer Herbicide/Weed Control Irrigation Systems Pest Management...Minimum Sustainable Goals Herbicide/Weed Control Goal: 75% of purchases meet one or
    https://sftool.gov › Content › attachments › SA-DOE-GreenBuyAwdGuide-FY2024.pdf
  • Sustainability Success at the Provo Area Office J. Kresge and C. Southworth, March 2017

    Cooling Tower and Sump Pneumatic Controls & Compressor Aging/Outdated Mechanical...Area VAV Selector Buttons VAV Box Control Window Airflow Settings Temperature
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › Sustainability Success at the Provo Area Office %E2%80%93 J. Kresge and C. Southworth March 2017.pdf

   Page
      2       3       4       5       6      7       8       9       10       11
Powered by Search.gov