Ongoing Commissioning (OCx) is the continuous process of optimizing building performance through investigating, analyzing, and monitoring the performance of building systems.

Procure Products

in the Green Procurement Compilation

78 Results : Ongoing Commissioning

  • Operational Carbon - GSA Sustainable Facilities Tool

    EnergyPlus Building Commissioning, Retro-commissioning and Re-tuning Building...Building Commissioning is a process of verifying and documenting that the facility
    https://sftool.gov › learn › about › 659 › operational-carbon
  • System Bundling > Submetering - GSA Sustainable Facilities Tool

    ...system efficiencies and implementing an ongoing occupant education program can be...system efficiencies and implementing an ongoing occupant education program can be
    https://sftool.gov › explore › green-building › section › 89 › submetering › system-bundling
  • Mandates / Standards > Water - GSA Sustainable Facilities Tool

    ...water evaluations through retro-commissioning of 25 percent of covered facilities...0.htm Relation to Water: water commissioning, solar hot water equipment, water
    https://sftool.gov › explore › green-building › section › 22 › water › relevant-mandates-and-rating-systems
  • System Bundling > IEQ - GSA Sustainable Facilities Tool

    ...system efficiencies and implementing an ongoing occupant education program can be...system efficiencies and implementing an ongoing occupant education program can be
    https://sftool.gov › explore › green-building › section › 33 › ieq › system-bundling
  • System Bundling > Water - GSA Sustainable Facilities Tool

    ...system efficiencies and implementing an ongoing occupant education program can be...system efficiencies and implementing an ongoing occupant education program can be
    https://sftool.gov › explore › green-building › section › 21 › water › system-bundling
  • System Bundling > Lighting - GSA Sustainable Facilities Tool

    Demand-Control Ventilation, Ongoing Commissioning Building automation consists...among building systems. Employ ongoing commissioning practices to ensure building
    https://sftool.gov › explore › green-building › section › 4 › lighting › system-bundling
  • Mandates / Standards > HVAC - GSA Sustainable Facilities Tool

    Buildings HVAC systems must be commissioned (and recommissioned), and integrative...HVAC: employ integrative design, commissioning (HVAC and controls), energy efficiency
    https://sftool.gov › explore › green-building › section › 13 › hvac › relevant-mandates-and-rating-systems
  • Mandates / Standards > Submetering - GSA Sustainable Facilities Tool

    ...management projects through both commissioning and retrofits, and monitor and...cost-effectiveness, retrofits, commissioning Energy Policy Act of 2005 (EPAct
    https://sftool.gov › explore › green-building › section › 90 › submetering › relevant-mandates-and-rating-systems
  • Building Certification Standards Crosswalk - GSA Sustainable Facilities Tool

    Employ Integrated Design Principles: Commissioning GP 2.1. Optimize Energy Performance:...Density and Diverse Uses i:29 gp:106 Commissioning Integrated Design GP 1.5. Employ
    https://sftool.gov › learn › GRScrosswalk
  • Project Team - GSA Sustainable Facilities Tool

    ...consultant, lighting designer, commissioning authority and many others. For...Strong Leadership Team Culture Conduct ongoing peer review engagement with experts
    https://sftool.gov › plan › 586 › project-team
  • Financial > Submetering - GSA Sustainable Facilities Tool

    ...managing demand loads. Continuous Commissioning 15% to 45% Improved awareness,...inspection. Recurring costs include the ongoing operations and maintenance of the
    https://sftool.gov › explore › green-building › section › 94 › submetering › financial-impact
  • PowerPoint Presentation

    Evaluation requirements Impacts to the Commissioning and the Auditing requirements as...term ‘ongoing commissioning' meaning “an ongoing process of commissioning using
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › Summary Impacts of EA 2020.pdf
  • Guiding Principles for High Performance and Sustainable Federal Buildings and Associated Instructions

    ...2025 as long as they continue to meet ongoing requirements such as Energy Independence...including quadrennial evaluations, ongoing commissioning, benchmarking, and operating
    https://sftool.gov › Content › attachments › guiding_principles_for_sustainable_federal_buildings_and_associated_instructions_february_2016.pdf
  • MaterialDetails - GSA Sustainable Facilities Tool

    Tips Controls need to be commissioned on an ongoing basis to ensure proper function
    https://sftool.gov › material › 1993 › occupant-sensor
  • Policies & Strategies - GSA Sustainable Facilities Tool

    ...including structured training and ongoing “help desk” support; and lists several...provide background for and describe ongoing efforts of the agency's Advanced Metering
    https://sftool.gov › learn › agency-practices › 444 › iswg-policies-strategies
  • PowerPoint Presentation

    Maintenance TAB Contractor Commissioning Contractor LVMP Manager/Coordinator...Maintenance 3. Lab Environment Tests 5. Ongoing Monitoring 4. Routine Hood Tests 2
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › 4 - NREL - 3Flow - Smart Labs - LVMP Preso for ISWG 3-7-19 v1.pdf
  • MaterialDetails - GSA Sustainable Facilities Tool

    Controls needs be calibrated / commissioned on an ongoing basis to ensure proper function
    https://sftool.gov › material › 1996 › timer
  • MaterialDetails - GSA Sustainable Facilities Tool

    Controls needs be calibrated / commissioned on an ongoing basis to ensure proper function
    https://sftool.gov › material › 2106 › daylight-controls
  • Mandates / Standards > Solid Waste - GSA Sustainable Facilities Tool

    Credit Name SSc5 Site Management MRp1 Ongoing Purchasing and Waste Policy MRp2 Facility...Renovation Policy MRc1 Purchasing - Ongoing MRc3 Purchasing - Facility Maintenance
    https://sftool.gov › explore › green-building › section › 65 › solid-waste › relevant-mandates-and-rating-systems
  • Microsoft Word - Facility Manager JTA For Public Comment V4.docx

    ...control Available amenity programs Commissioning processes BAS knowledge Communications...Forecasting software and/or system Commissioning documents Historical data Communication