Building Commissioning

The process that focuses on verifying and documenting that the facility and all of its systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the Owner's Project Requirements. This means testing all systems (HVAC, lighting controls, domestic hot water systems, etc.) to ensure they function as intended. Proper commissioning saves energy, reduces risk, and creates value for building operators. It also serves as a quality assurance process for enhancing the delivery of the project.

DOE EERE | Commissioning for Federal Facilitiesopens in new window

Building Commissioning Associationnon government site opens in new window

Procure Products

in the Green Procurement Compilation

79 Results : Building Commissioning

  • Standard 189.1-2014

    Design of High-Performance Green Buildings ISWG Update March 19, 2015 Don Horn...of Federal High-Performance Green Buildings Standard 189.1 Collaborative effort
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › 1 Don Horn - 189 2014 Update.pdf
  • PowerPoint Presentation

    Auditing, Commissioning, and Retro- Commissioning T9: Integrated Building Design
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › 2020 EEx ISWG Presentation 200423.pdf
  • Title of presentation

    To Edit Master Title Style Better Buildings: Select Resources for Federal users...Taddonio DOE Building Technologies Office  Commercial buildings—our offices
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › 9 Kristin Tadonio - Cross-Sector EE Opportunities.pdf
  • Integrative Design Process > Water - GSA Sustainable Facilities Tool

    ...integrative design process understands that buildings, their components, and their context...integrative design process understands that buildings, their components, and their context...context are interrelated. Whole-building systems observe this principle by involving
    https://sftool.gov › explore › green-building › section › 19 › water › integrative-design-process
  • Follow these steps to identify the right training for you:

    General Services Administration Federal Buildings Personnel Training Act Core Competencies...Competencies for Federal buildings Personnel Recommended Curriculum and Continuing
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › 2 - ISWG FBTPA Tools and Resources Brief 180920.pdf
  • ESPC ENABLE PROGRAM

    ...intended for Federal facilities with buildings under 200,000 square feet  Project...condensate reclaim) HVAC Controls Whole building control strategies including: Time/Temperature
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › ISWG.ESPC ENABLE Jan 21 2016_final.pdf
  • BOMA Best 3.0 (Statutory Compliance with Guiding Principles)_12-2020.pdf

    ...agencies choosing to use a third-party building certification system, GSA has developed...Principles for Sustainable Federal Buildings checklist criteria. Agencies may
    https://sftool.gov › Content › attachments › BOMA Best 3.0 (Statutory Compliance with Guiding Principles)_12-2020.pdf
  • FBI Energy and Water Steering Committee Meeting FY21 Q2

    ...energy savings (e.g. HVAC retro-commissioning), are of lower priority than more...lighting retrofits, HVAC improvements, building automation system upgrades, metering
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › FEWCIP Huxley and Koprowski ISWG 4.15.21.pdf
  • BREEAM 2016 (Statutory Compliance with Guiding Principles)_12-2020.pdf

    ...agencies choosing to use a third-party building certification system, GSA has developed...Principles for Sustainable Federal Buildings checklist criteria. Agencies may
    https://sftool.gov › Content › attachments › BREEAM 2016 (Statutory Compliance with Guiding Principles)_12-2020.pdf
  • PowerPoint Presentation

    Analysis *Includes the co-hosted Better Buildings Summit 4U.S. DEPARTMENT OF ENERGY...Foundation (2) Nuclear Regulatory Commission (1) U.S. Postal Service (1) Library
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › 2 - EEx19 Overview ISWG - 12.05.19.pdf
  • Sustainability Success at the Provo Area Office J. Kresge and C. Southworth, March 2017

    Rising utility bills Clerestory building design (high ceilings with 20 degree...was conducted and found that the building was about 42% compliant with the Guiding
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › Sustainability Success at the Provo Area Office %E2%80%93 J. Kresge and C. Southworth March 2017.pdf
  • Microsoft Word - Facility Manager JTA For Public Comment V4.docx

    ...of Energy. A Facility Manager is a building maintenance specialist and property...property administrator who conducts building operations and maintenance activities
    https://sftool.gov › Content › attachments › Facility Manager JTA For Public Comment.pdf
  • Slide 1

    ...$365,000,000, Actual Costs: Design Build Contract $345,993,516 CM Contract $7...being one of the Nation's safest buildings. The courthouse joins a neighborhood
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › LA Courthouse - D Allen GSA - ISWG 180517.pdf
  • Advanced energy star® training

    Number of Leases 8,845 (#) Number of Buildings 7,331 (#) Leased Rentable Square...Government Tenancy Within Leased Building In 23% of (#) Leases, GSA = 95100%
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › Green Leasing - AKosmides Mar2013.pdf
  • PowerPoint Presentation

    ...integration High-performance green building construction or renovation Large-...assistance Acceptance testing and commissioning Performance period (O&M and M&V)
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › RE Catalog of Servcies - BKovacic May2013.pdf
  • Building Glass and Lighting Impacts and Solutions

    ...Building Glass and Lighting Impacts and Solutions Building Glass and Lighting...Impacts © David Sibley Building Glass Collisions with buildings kill an average of
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › Building Glass and Lighting Impacts and Solutions (FWS Mar 2015).pdf
  • PowerPoint Presentation

    ...sustainability planning Building Automation System Re-Commissioning Tested with PNNL...savings per building Base trained and replicating at other buildings. Can/should
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › 1 - 20160519 LCIC ISWG FINAL.pdf
  • Government Facility Sustainability Performance in FY 2016

    Guiding Principles for Sustainable Buildings (Goal: 15% in 2025) Efficiency...Follow-up/ M&V Evaluations (audit and commissioning assessment)) Prioritize ECMs and
    https://sftool.gov › Content › attachments › Iswg › iswg-policies-strategies › ISWG Tremper 07-20-2017.pdf
  • PowerPoint Presentation

    Copyright © 2019 Why Focus on Laboratory Buildings? Laboratories use significant energy...more energy than an average office building Case examples indicate cost-saving
    https://sftool.gov › Content › attachments › Iswg › iswg-case-studies › 4 - NREL - 3Flow - Smart Labs - LVMP Preso for ISWG 3-7-19 v1.pdf
  • PowerPoint Presentation

    ...and Leadership 903 100.33 5 Optimal Building Performance Strategies 850 94.44 7...Practices 562 62.44 6 High Performance Buildings 496 55.11 12U.S. DEPARTMENT OF ENERGY
    https://sftool.gov › Content › attachments › Iswg › iswg-tools › ISWG_EEx Feedback Presentation_10-05-17.pdf

   Page
      1       2      3       4